Flat 30% off for Singapore 🇸🇬
Book a 30-min call →
5 days · $700 · fixed

Ship It Live · landing page sprint

One page that converts, live in 5 days.

Somewhere better to send your ad traffic. Structured, designed, built and capturing leads by Friday — for a number agreed on Monday.

Enter to send
4.93★ / 32 reviews 75+ shipped Kickoff in 24h

Quick answer

A conversion-focused landing page can be designed, built and deployed in 5 days for a fixed $700, including lead capture by WhatsApp or web form. What decides whether it works is the order the page makes its argument in, which gets settled on day one before any design.

The plan

Day one to day 5, written down.

You get this schedule before you commit, not after. If a phase slips, that is mine to absorb — the price and the date were agreed before anything started.

The scheduleDay 1 → day 5
01StructureDay 1
02DesignDays 2–3
03BuildDay 4
04LaunchDay 5
  1. 1

    Day 1

    Structure

    What the page must prove, in what order, and what the single action is. This is the day that decides whether the page converts.

  2. 2

    Days 2–3

    Design

    The full page designed mobile-first, with any custom graphics made rather than sourced from stock.

  3. 3

    Day 4

    Build

    Coded, responsive and fast, with lead capture wired to wherever you actually check.

  4. 4

    Day 5

    Launch

    Live on your domain, tracking connected, and a test lead sent through end to end so you know it works.

What $700 gets you

Everything needed to launch — nothing padding the invoice.

Page structure decided before design — the part that decides conversion
Custom design, built mobile-first
Custom graphics where a stock photo would undersell the point
WhatsApp button and web form, both wired and tested
Live on your domain, fast on mobile data
Analytics and conversion tracking connected
Source and design files yours at handover
30 days of post-launch support, included

Who books this

Built for

Businesses running ads with nowhere good to send the clicks

Founders validating an offer before building the whole product

Anyone who needs one page done properly, not a five-page site

Real situations

Five ways this shows up, and what actually fixes it.

Not hypothetical — the shape of the problem before someone books this sprint, and the specific part of the build that resolves it.

Situation 1

Running ads with nowhere good to send the clicks

A business is spending real money on ad traffic that lands on a generic homepage or, worse, a competitor-style template that doesn't match what the ad actually promised.

A conversion-focused page built to the specific offer goes live in 5 days, with lead capture wired and tested end to end before launch.

Situation 2

Validating an offer before building the whole product

A founder wants to know if anyone will actually pay for an idea before investing months building it, but has no fast, credible way to test real demand.

Structure is decided on day one — the page's whole argument — and it's live capturing leads by day five, for $700 fixed.

Situation 3

An AI-drafted page that reads fine and converts nothing

A founder used an AI tool to draft a landing page quickly, and while the words are roughly right, the structure and hierarchy quietly work against the one action the page should drive.

Rebuilding from a proper structural plan usually outperforms reworking an AI draft, since the fix is in the argument's order, not the copy.

Situation 4

Needs one page done properly, not a five-page site

A business only needs a single, focused conversion page right now, but every quote they've received assumes a full multi-page site whether they need one or not.

This sprint is scoped to exactly one page, built mobile-first, for a fifth of the cost of a full site — because that's all the job requires.

Situation 5

Leads are landing somewhere nobody actually checks

A previous page's contact form sends to an inbox that gets checked sporadically, quietly losing leads that would have converted with a faster response.

Lead capture routes to wherever the business actually checks — often a WhatsApp button plus a form — tested with a real lead sent through before launch.

The honest part

When 5 days is the wrong answer.

A fixed deadline only works when the scope genuinely fits inside it. These are the cases where I will tell you so rather than take the booking.

Multi-page sites — that is the 14-day website sprint, not this.

Pages with no offer behind them yet. If you do not know what you are selling, the page cannot rescue it.

Projects where copy has to be researched and written from scratch, which needs longer than five days to do well.

Scope$700 · 5 days

Inside the 5 days

  • Page structure decided before designthe part that decides conversion
  • Custom design, built mobile-first
  • Custom graphics where a stock photo would undersell the point
  • WhatsApp button and web form, both wired and tested
  • Live on your domain, fast on mobile data
  • Analytics and conversion tracking connected
  • Source and design files yours at handover
  • 30 days of post-launch support, included

Quoted as one number before day one. A week running long is mine to absorb.

Outside the line

  • Multi-page sitesthat is the 14-day website sprint, not this.
  • Pages with no offer behind them yet. If you do not know what you are selling, the page cannot rescue it.
  • Projects where copy has to be researched and written from scratch, which needs longer than five days to do well.

Real work, sized and priced separately. You hear it before you book, not at handover.

Questions

Before you book

Yes, comfortably, when the offer is clear and assets are ready on day one. Five working days covers structure, design, build, deployment and lead capture.

Argument order before pixels

A 5-day landing page is one offer, one argument order, and one CTA. Fixed price: $700; it is not a mini-site in disguise.

In scopeOut of scope
Promise: what the visitor getsVague headline with no offer
Proof: why the offer is believableInvented testimonials or metrics
Offer: what they buy or bookSecondary offers competing
CTA: the one actionA form nobody checks

Design and handoff bar

  • Offer and CTA are clear on day one
  • Form or agreed channel is wired
  • Named owner receives a real test lead
  • Domain, HTTPS, and mobile review are done
  • Extra sections wait if they do not serve the CTA

Soft planning rule (not an SLA): lock the primary job early, review edge cases before launch week, and keep accounts and source in your name at handoff.

Extra questions

Does it include copy?

Bring the offer and must-use lines on day one. Structure and build are in scope; exact copy ownership is confirmed on the call.

Will ads convert?

We test lead capture but do not promise ROAS or a conversion lift.

What if I need more pages?

Grow into the website sprint rather than forcing a multi-page site into five days.

5 days from now, this could be live.

A 30-minute call decides whether the scope fits. If it doesn't, I'll tell you what would.